Reference production plan — the products, targets and worker skill are an editable example, not your current factory.

Production planning workspace

Plan Your Entire Big Ambitions Factory

Set production targets, assign recipes and a worker skill profile, then see how many whole batches, ingredients and warehouse movements your factory needs.

Static recipe data determines ingredients and output per batch. Exact machine capacity appears only after you enter observed batches per workstation/day.

Scenario toolbar

Set Production Targets

1

Plan result

7 batches/day

1120 output/day

+120 surplus/day

2

Plan result

5 batches/day

400 output/day

3

Plan result

5 batches/day

800 output/day

+100 surplus/day

Your Factory Production Board

Each lane plans whole recipe batches. Surplus remains visible because ingredient demand follows planned batches rather than the exact target.

Frozen Food

Target 1,000/day · Factory Worker skill changes effective output. 160/Whole batches

+120 surplus/day

01

Ingredients / batch

Chicken Breast ×200 · Vinaigrette ×100

02

Food Production

7 Whole batches / day

03

1,120 Frozen Food

Target 1,000/day

Limited Edition Book

Target 400/day · Factory Worker skill changes effective output. 80/Whole batches

At target

01

Ingredients / batch

Paper ×2 · Expensive Fabric ×100

02

Consumer Goods Production

5 Whole batches / day

03

400 Limited Edition Book

Target 400/day

Salad

Target 700/day · Factory Worker skill changes effective output. 160/Whole batches

+100 surplus/day

01

Ingredients / batch

Vinaigrette ×100 · Lettuce ×200 · Tomato ×100 · Pepper ×100 · Onion ×100

02

Food Production

5 Whole batches / day

03

800 Salad

Target 700/day

What Does Your Factory Need Each Day?

Shared ingredients are merged from whole planned batches across every product.

Stock buffer
IngredientRequired / day3 stock targetBase value / dayUsed by
Chicken Breast1,4004,200$490.00Frozen Food 1400
Expensive Fabric5001,500$6,000.00Limited Edition Book 500
Lettuce1,0003,000$280.00Salad 1000
Onion5001,500$70.00Salad 500
Paper1030$62.50Limited Edition Book 10
Pepper5001,500$50.00Salad 500
Tomato5001,500$145.00Salad 500
Vinaigrette1,2003,600$120.00Frozen Food 700 · Salad 500

Base ingredient-value estimate: $7,217.50/ day. This excludes payroll, rent, storage and logistics.

Send ingredient plan to Warehouse →

How Much Work Is Assigned to Each Workstation Type?

Planned batches are known from recipe data. Workstation counts become capacity estimates only after you add observed throughput.

Heaviest planned group

Food Production

12batches/day

Frozen Food 7 · Salad 5

Workstation group

Consumer Goods Production

5batches/day

Limited Edition Book 5

Can Your Current Factory Staffing Cover the Plan?

Simultaneous staffing check: 2 slots / 2 workers.

What Will Leave the Factory?

Frozen Food

7 planned batches

1,120units/day

Limited Edition Book

5 planned batches

400units/day

Salad

5 planned batches

800units/day

Current Plan vs Test Skill

80

Test one skill change while product targets stay fixed. Training cost and wage changes are not included here.

ProductCurrent batchesTest batchesChangeTest output/day
Frozen Food76-11080
Limited Edition Book550450
Salad54-1720

Total planned batches: 1715 / day (-2)

Compare against training cost →

Continue this production plan

Carry the selected output, production target and Factory Worker skill into the full business simulation.

Continue in Full Simulator →

Factory Plan Health

Product targets

3 planned batches

Recipe plan

17 Whole batches / day

Ingredient plan

8 Ingredient types

Workstation capacity

Needs input

!
Staffing

Entered coverage sufficient

Warehouse flow

2,320 units/day

How Factory Production Planning Works in Big Ambitions

Recipes define each production batch. Every recipe has fixed ingredient quantities, a base output and a required workstation family. Planning uses complete batches so ingredient requirements and surplus stay visible.

Factory Worker skill changes effective output. A higher effective output can reduce the number of batches needed for the same target, which also changes daily ingredient demand.

Multiple recipes share factory resources. Ingredient demand is aggregated across products, while recipes assigned to the same workstation family contribute to one combined planned batch load.

Exact machine capacity needs a throughput assumption. Until reliable cycle duration is available, the planner separates game recipe data from observed batches per workstation/day entered by the player.